Uncategorized

Transporting storage tank from Bressay to Greenock for Pelagia

Client Overview Client: Pelagia Industry: Aquaculture Location: Bressay, Shetland Project Date: 20/11/2024 The Challenge: Pelagia required a large tank to be relocated from their site in Bressay, Shetland, to another site in Greenock on the Scottish mainland. This project presented a range of logistical and technical challenges due to the size of the tank and… Continue reading Transporting storage tank from Bressay to Greenock for Pelagia

LTS Latest: Trip to London for Great River Race (LTS Haulage)

LTS Shetland was asked to take the Burra & Lerwick yoals to London for them to compete in the Great River Race. The Great River Race is a 21.6 mile long race along the Thames.  Burra won their class and Lerwick battled hard to finish in the top 10. We safely took the yoals from… Continue reading LTS Latest: Trip to London for Great River Race (LTS Haulage)

Summer at LTS Shetland

At LTS Shetland, we pride ourselves on delivering quality work to our customers and clients in & around Shetland. Throughout the summer, we have continued to provide our Engineering and Plant Hire services to a number of local and visiting companies and contractors.  However, we have seen an increase in haulage support for the likes… Continue reading Summer at LTS Shetland

PROJECT: Lifting & Removing Boat

We had been given the task of lifting and moving this boat for a new customer. After purchasing the boat, it had to be lifted from the garden of the previous owner and loaded onto transport.  With the boats positioned in the garden, it was going to prove a challenging task as we would not… Continue reading PROJECT: Lifting & Removing Boat