admin_lts

Safe Delivery of 58-Ton Transformer to Lerwick Grid Station

Client Overview Client: RRS GroupIndustry: Transport CompanyLocation: Lerwick Port – New Grid Supply Station, LerwickProject Date: 14/02/2025 – 15/02/2025 The Challenge: RRS Group required LTS Shetland’s expertise to transport a 58-ton transformer unit from Greenhead Base at Lerwick Port to the new Grid Supply Point in Lerwick. They chose LTS Shetland due to our proven… Continue reading Safe Delivery of 58-Ton Transformer to Lerwick Grid Station

Transporting a 38 ton winch unit from Lerwick to Aberdeen

Client Overview Client: NorthwardsIndustry: Transport CompanyLocation: Lerwick–AberdeenProject Date: 19/11/2024 The Challenge: Northwards required LTS Shetland’s expertise to transport a 38-ton winch unit from Greenhead Base in Lerwick, where it arrived on an oil vessel, to its final destination at Subsea in Aberdeen. The client sought out LTS Shetland due to our specialisation in heavy haulage… Continue reading Transporting a 38 ton winch unit from Lerwick to Aberdeen

Transporting storage tank from Bressay to Greenock for Pelagia

Client Overview Client: Pelagia Industry: Aquaculture Location: Bressay, Shetland Project Date: 20/11/2024 The Challenge: Pelagia required a large tank to be relocated from their site in Bressay, Shetland, to another site in Greenock on the Scottish mainland. This project presented a range of logistical and technical challenges due to the size of the tank and… Continue reading Transporting storage tank from Bressay to Greenock for Pelagia

LTS Latest: Trip to London for Great River Race (LTS Haulage)

LTS Shetland was asked to take the Burra & Lerwick yoals to London for them to compete in the Great River Race. The Great River Race is a 21.6 mile long race along the Thames.  Burra won their class and Lerwick battled hard to finish in the top 10. We safely took the yoals from… Continue reading LTS Latest: Trip to London for Great River Race (LTS Haulage)

Summer at LTS Shetland

At LTS Shetland, we pride ourselves on delivering quality work to our customers and clients in & around Shetland. Throughout the summer, we have continued to provide our Engineering and Plant Hire services to a number of local and visiting companies and contractors.  However, we have seen an increase in haulage support for the likes… Continue reading Summer at LTS Shetland

PROJECT: Lifting & Removing Boat

We had been given the task of lifting and moving this boat for a new customer. After purchasing the boat, it had to be lifted from the garden of the previous owner and loaded onto transport.  With the boats positioned in the garden, it was going to prove a challenging task as we would not… Continue reading PROJECT: Lifting & Removing Boat

Latest at LTS – September 2023

LTS Shetland continues to invest in the business to offer the best possible service to our clients and for new customers. We have now moved to a workshop at Brindister. This is a more central location for carrying out all our works. The workshop is bigger and has more storage which has enabled us to… Continue reading Latest at LTS – September 2023